• Home
    Home
     
  • Export page as PDF
    Download
    Page PDF
  • Download page and all referenced files
    Download
    Files

One Energy has unveiled the initial configuration and energization of its 30 megawatt (MW) electric semi-truck fleet charging site, located at its first Megawatt Hub in Findlay, Ohio.

Read the full press release here.