• Home
    Home
     
  • Export page as PDF
    Download
    Page PDF
  • Download page and all referenced files
    Download
    Files

The physical construction of One Energy’s Wind for Industry® and ManagedHV™ projects begins within our laydown yard at the North Findlay Wind Campus. This area houses components purchased in advance to build different industrial power projects, from the nacelles and wind turbine blades for Wind for Industry to the high voltage cables and transformers for ManagedHV™.

Why do we stock all these components? For one, logistics can be time-consuming, and stocking components allows One Energy to cut down on long lead times. Additionally, there are economies of scale associated with larger orders. As a result, One Energy purchases and stores equipment in advance. This strategy both reduces costs and helps ensure projects are completed on time.